Recently, typhoons and heavy rains have occurred frequently in coastal areas, which not only causes inconvenience to people's daily lives, but also affects the operation and efficiency ofsolar systems. As a connector to linksolar panels andsolar plants, solar mounting systems play an important role in PVsystems. Today, Grace Solarwill describe how to ensure the stable operation of solar plantsfrom two aspects ofmounting system selection, installation and maintenance.
光伏支架的类型选择
Type selection of solar mounting system
要满足光伏电站运行25年的要求,光伏支架不仅要选用高质量的材质以确保强度和耐久性,还要保证结构上的牢固性以满足风压、雪压的要求。在具体光伏项目的实践中,要综合考虑安装场地的地形、气候等条件进行光伏支架的选择和方案设计。如在目前较大规模的地面电站建设上,就应考虑到地形条件、地质灾害隐患、积水深度、洪水水位、排水条件等。
To meet the requirements of power generation for 25 years, the solar mounting system must not only use high-quality materials to ensure strength and durability, but also ensure structural firmness to meet the requirements of wind loadand snow load. In the practice of specific photovoltaic projects, it is necessary to comprehensively consider the terrain, climate and other conditions of the installation site for the selection and scheme design ofmounting systems. For example, in the current construction of utility scaleground solar plants, topographical conditions, hidden dangers of geological disasters, depth of accumulated water, flood water level, drainage conditionsshould be taken into consideration.
(日本-55MW大型山地光伏支架)
(日本宫城县-多雪地面倾斜支架)
(南非-跟踪支架)
光伏支架的安装与维护
Installation and Maintenance of solar mounting systems
安装:按照设计要求进行正确的安装,确保所有螺栓、焊缝连接牢固,保证光伏方阵整体不出现变形、错位、松动等现象;在与使用金属边框的光伏组件连接时,注意边框和光伏支架的结合良好,两者之间接触电阻不大于4Ω,边框必须牢固接地。
Installation:Carry out correct installation according to the design requirements, ensure that all bolts and welds are firmly connected, and ensure that the overall PVarray does not appear to be deformed, dislocated, loose, etc.; when connecting with solar modules, pay attention to the frames, the contact resistance between the two is not greater than 4Ω, and the frame must be firmly grounded.
维护:日常加强对光伏电站的全面检查,对松动、损坏的零部件进行维护和更换,关注光伏支架表面的防腐涂层完整情况,及时进行补刷;关注天气变化,在强降水来临前增设临时排水设施,对接地系统进行检查,在恶劣天气前后排查整体情况。
Maintenance:Strengthen the comprehensive inspection of PVpower plants on a daily basis, maintain and replace loose and damaged parts, pay attention to the integrity of the anti-corrosion coating on the surface of the mounting system, and carry out timely repainting; pay attention to weather changes, and add temporary drainage facilities, check the grounding system, and check the overall situation before and after bad weather.
施工现场
国瑞能光伏支架,您的信赖之选
Grace Solar, your trustworthy smart solar mounting system supplier
国瑞能专注光伏支架领域十余载,目前已拥有一支专业高效、经验丰富的研发和服务团队。国瑞能高度重视光伏支架的研发和生产,具有严格的国际化品质管控体系,获得了SGS、UL、TÜV、MCS、JIS、TAF、AS/NZS1170、风洞测试等国内外权威认证。
Grace Solar has been focusing on the field of solar mounting system for more than ten years and currently has a professional, efficient and experienced R&D and service team. Grace Solarattaches great importance to theR&Dand production ofsolar mounting systems, has a strict international quality control system, and has obtained authoritative certifications at home and abroad,such as SGS, UL, TÜV, MCS, JIS, TAF, AS/NZS1170, and wind tunnel testing.
接下来,我们也将持续注重科技创新,依托卓越的研发实力、过硬的质量水平以及专业的服务态度,做客户值得信赖的光伏支架品牌,助力全球绿色能源可持续发展。
In the next, we will continue to focus on technological innovation, relying on excellent R&D strength, excellent quality level and professional service attitude, to become a trustworthy photovoltaic bracket brand for customers, and to help the sustainable development of global green energy.
特别声明:北极星转载其他网站内容,出于传递更多信息而非盈利之目的,同时并不代表赞成其观点或证实其描述,内容仅供参考。版权归原作者所有,若有侵权,请联系我们删除。
凡来源注明北极星*网的内容为北极星原创,转载需获授权。
4月1日,申能新疆塔城和布克赛尔县200万千瓦光伏项目光伏区PC总承包中标结果公布,中标企业有中国建筑第六工程局有限公司、中建八局总承包建设有限公司、中铁十五局集团第二工程有限公司、中国建筑第二工程局有限公司。中标单价在1.47-1.583元/W。招标公告显示,项目建设规模为2000MW(直流侧约2400MWp)
3月31日,华能滨州85万千瓦光伏项目实现全容量并网发电。华能滨州85万千瓦光伏项目是国家第三批大型风电光伏基地建设项目,也是国家海洋立体确权政策颁布后首个获批的光伏用海项目。项目位于山东省滨州市沾化区滨海镇,占用海域滩涂1.58万亩,安装光伏组件169万余块,敷设电缆超8000公里,集电线路最大
在全球能源结构加速转型的进程中,光伏电站长期运维与效能面临严峻考验。行业数据显示,光伏组件积灰问题可导致发电效率严重衰减,其衍生的热斑效应与组件老化现象更直接影响电站安全性与投资回报。针对这一行业共性难题,正泰新能高效防积灰组件通过结构性创新实现光伏系统的“自清洁”能力,为全球工
近日,湖南多个高速收费站光伏项目即将并网发电。截至目前,湖南高速已成功建成98座光伏电站,总装机容量达22兆瓦。怀化片区收费站光伏项目,为湖南高速首个成片区开发光伏项目,充分利用了收费站闲置空间,为区域能源供应增添了绿色选择。资阳服务区光伏项目首次实现高速公路互通光伏“就近消纳”,服
3月30日,晋北采煤沉陷区新能源基地光伏场区建设项目EPC工程总承包中标候选人公布,入围企业来自于中国电建集团西北勘测设计研究院有限公司、中国能源建设集团云南省电力设计院有限公司、中国能源建设集团江苏省电力设计院有限公司、中国电力工程顾问集团西北电力设计院有限公司、中国能源建设集团广西
近日,我国在南极秦岭站建设的首个规模化新能源系统正式启用,这一突破性进展标志着中国极地科考正式迈入绿色能源时代。维旺光电基于极地环境定制研发的抗极寒光伏支架系统,有幸随中国科学院上海微系统所参与中国第41次南极科考任务,为秦岭站新能源供电系统的建设与运行提供了相应技术支持。南极地区
3月26日,卧龙资源集团股份有限公司(以下简称“卧龙地产”)发布公告称,3月25日,公司召开第十届董事会第七次会议,审议通过《关于变更公司名称的议案》,同意公司拟将名称变更为“卧龙新能源集团股份有限公司”(英文名称:WolongNewEnergyGroupCo.,Ltd.)。根据公告,变更公司名称的理由为卧龙地
3月23日,贵阳院承建的国能灵绍直流配套200万千瓦复合光伏基地二期光伏项目电力工程EPC总承包十标段实现首批100MWp光伏场区并网发电。项目位于宁夏灵武市马家滩镇,直流侧总容量为200MWp,容配比约为1.2,采用固定支架安装,光伏系统使用N型715Wp/720Wp单晶硅双面双玻太阳能组件共计278564块,全站共分
3月27日,中成股份发布公告车工,公司于当地时间3月25日与刚果(布)TINDAENERGY公司在刚果(布)经济特区部签署《刚果(布)英吉经济特区56MW光伏项目设计、采购和施工(EPC)合同》,合同金额为7595.54万美元(约合人民币5.45亿元)。公告显示,该项目范围涵盖光伏电站、两条10公里33千伏输电线路、2
近日,从阿里资产网站获悉,位于云南省红河哈尼族彝族自治州建水县的41MW光伏单站已完成第十一次拍卖。此次起拍价为66,497,884.83元,成交价为66,497,884.83元。根据竞拍公告,该电站市场价为156,617,041.17元。据了解,该电站于2016年6月11日正式投产运营,并于2017年4月1日获批合计41兆瓦的建设规模
请使用微信扫一扫
关注公众号完成登录
姓名: | |
性别: | |
出生日期: | |
邮箱: | |
所在地区: | |
行业类别: | |
工作经验: | |
学历: | |
公司名称: | |
任职岗位: |
我们将会第一时间为您推送相关内容!